Importing motorcycles from China is one of the most cost-effective ways to build a two-wheeler business — but the first order can feel complicated. This guide walks through the complete process, from choosing a supplier to receiving your container.
Step 1: Define Your Market Before You Choose a Model
The most common first-time mistake is choosing models before understanding the market. Answer these questions first:
- Who is the end user? Commuters, delivery riders, off-road enthusiasts or cargo operators need very different machines.
- What displacement dominates? In most Southeast Asian and African markets, 100–150cc commuters outsell everything else. In Latin America, 150–250cc street bikes lead.
- What certification is required? EEC for Europe, EPA for the US, and local homologation in many countries. A model that can't be registered can't be sold.
Step 2: Verify the Manufacturer
Anyone can build a website. A real manufacturer can prove:
- Factory address and production line photos (or better: a video call walkthrough)
- Business license and export records
- Certifications matching your target market
- References from existing export markets
If a supplier resists a factory visit or video verification, walk away.
Step 3: Start With a Sample Order
Never place a container order without testing samples first. A sample order of 1–2 units costs little and tells you everything: build quality, actual specs versus claimed specs, packaging quality, and how the supplier handles logistics.
Step 4: Understand CBU, SKD and CKD
- CBU (Complete Built Unit): fully assembled, ready to sell. Fastest, but highest import duty in most countries.
- SKD (Semi Knocked Down): partial assembly required locally. Lower duties, simple assembly.
- CKD (Completely Knocked Down): full local assembly. Best economics at volume, but requires assembly capability.
Most first-time importers start with CBU to test the market, then evaluate SKD/CKD once volume justifies it.
Step 5: Payment, Lead Time and Documents
Standard payment terms are 30% T/T deposit, balance before shipment — or L/C at sight for larger orders. Typical lead times: 15–25 days for samples, 25–35 days for a first container. Your supplier should provide the full export document set: commercial invoice, packing list, bill of lading, certificate of origin, and any market-specific certificates.
The Short Version
Define your market, verify the factory, test with samples, start CBU, and scale from there. A good manufacturer will guide you through every step — talk to our export team if you'd like specific model recommendations for your market.